ICTSI’s Plan for Rijeka Port Includes Dredging

點擊次數:75   更新時間2019-06-14     【關閉分    享:
   Adriatic Gate Container Terminal (AGCT), the Croatian subsidiary of International Container Terminal Services Inc. (ICTSI) at the Port of Rijeka, is set to realize a comprehensive expansion plan in the period up to mid-2020.In close cooperation with the Rijeka Port Authority, AGCT has drawn up plans for a two-phase dredging scheme with the first phase fully-approved, entailing the dredging of 130 meters of quay over its Berths 1 and 2.
  亞得里亞海集裝箱碼頭(AGCT)是里耶卡港國際集裝箱碼頭服務公司(ICTSI)的克羅地亞子公司,將在2020年中期實現全面擴張計劃。AGCT與里耶卡港務局密切合作,制定了兩階段疏浚計劃的計劃,第一階段完全獲得批準,需要在其1號和2號泊位上疏浚130米的碼頭。
 
  According to ICTSTI, this will facilitate the berthing of vessels with a length overall (LOA) of up to 400 meters. The work will be completed by mid-2020, and will provide 438 meters of berth with a depth alongside of 15 meters.
  根據ICTSTI的說法,這將有助于停泊長度達400米的船舶(LOA)。這項工作將于2020年中完成,并將提供438米的泊位,深度為15米。“基礎設施工程的融資由歐盟和PRA提供,ICTSI承擔了對碼頭和陸側處理系統的所有相關必要投資,以及對終端最先進IT系統的覆蓋范圍的擴大,”該公司在發布時表示。

ShanDong Wenyuan Environmental Technology Co., Ltd
Add: Ai Village, Jinling Hui Nationality Town, Linzi Distract,
Zibo City, Shandong Province, China.
Ph:+0086 18369990600
Fax:+86-533-2076888
E-mai:sywenyuan@foxmail.com
 

黄网站色成年片免费